PROJECT DESCRIPTION

Villanova University Stadium

185 Ithan Avenue . Radnor . PA 19010

SCOPE OF WORK

  • Work Completed
  • The Villanova University Stadium was in desperate need of a faceift. 
  •  
  • We also has to ensure a watertight condition for all offices and storage spaces below the bleachers.
  •  
  • Major Philadelphia University
  • Waterblast the entire bleacher area to remove all existing coating and expose bare concrete
  • Coat entire bleacher area with an epoxy overlay using the school colors
  • Patch all loose sections of concrete
  • Remove and replace all expansion joints